• Skip to main navigation
  • Skip to content
  • Skip to primary sidebar
  • Skip to footer

Jersea RealtyJersea Realty

Sales & Summer Rentals

  • Home
  • Our Team
  • Communities
    • Barnegat Light
    • Beach Haven
    • Harvey Cedars
    • Long Beach Township
    • Ship Bottom
    • Surf City
  • Buyers
    • Email Update Signup
    • Mortgage Calculator
    • LBI Map Search
    • Basic Search
    • Search by Listing ID
    • Search by Address
  • Sellers
    • FREE CMA
  • Blog
  • Contact
SearchClose

Single-Lane Traffic on Route 72 Bridge Thorofares to Remain Until Spring

Starting Monday, Oct. 10, the East and West Thorofare bridges on the Route 72 Causeway Bridge will be reduced to one lane in each direction. The single-lane pattern will start just west of the West Thorofare Bridge and end just east of the East Thorofare Bridge on Long Beach Island.

This new traffic pattern will remain until springtime to permit the removal and replacement of the existing bridge deck joints on the south side of the bridges as well as a new bridge deck pavement overlay to enhance the riding surface for motorists, state Department of Transportation officials said.

Schiavone Construction Co. will shift traffic to the newly reconstructed north side of both thorofare bridges between 7 a.m. Monday through 5:30 a.m. the following day, DOT officials said. This new traffic pattern is expected to stay in place until mid-winter, when traffic will be shifted to the south side to enable the deck overlay to be installed on the north side.

A daily shuttle service will continue to be offered to pedestrians commuting over the newly constructed Causeway Bridge until the existing Causeway Bridge is rehabilitated and its bridge sidewalk is reopened and accessible to pedestrians by summer 2020.

Work on the $350 million Route 72/Manahawkin Bay Bridge project, which began in 2013, is anticipated to carry through 2020. The exact scheduling of the labor is dependent upon weather and other influences.

The 3-mile-long Causeway connects Stafford on the mainland with Ship Bottom on LBI. As part of the plan, a new bridge has been constructed parallel to the existing one over Manahawkin Bay, offering the security of a redundant route on or off the Island. The new bridge is 2,400 feet long with a vertical clearance of 55 feet over Manahawkin Bay. It presently has two lanes in each direction while the original Causeway Bridge is being rehabilitated. It will serve as the bridge for eastbound traffic when the project is finished.

For more information, visit 511nj.org. —K.A.E. Per TheSandPaper

Posted in: LBI News

Post navigation

« Get a Free Ride to the Polls on Nov. 8
Helpful tips for Buyers »

Contact Us Today!

Jersea Realty

1415 Long Beach Blvd.

Ship Bottom, NJ 08008

Office: 609-492-1666

Fax: 609-492-1699

LBI Homes For Sale

Barnegat Light

Beach Haven 

Harvey Cedars

Long Beach Township

Ship Bottom

Surf City

© 2025 · Jesea Realty

The data relating to real estate for sale on this website comes in part from Jersea Realty participation in the IDX /Broker Reciprocity Program of the Jersey Shore Multiple Listing Service, L.L.C. The information has been provided by Ocean County Board Of Realtors®, Inc. Real estate listings held by other brokerage firms are identified with the Seller's Representative. Information deemed reliable but not guaranteed. This information is being provided for consumers' personal, non-commercial use and may not be used for any purpose other than to identify prospective properties consumers may be interested in purchasing.

Terms of Use - Privacay Policy

Log in